< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1169854197701293&ev=PageView&noscript=1" />

Installation site of waste steel crushing production line

March 09 2022

The core equipment of the metal crushing production line is the metal crusher. We are an old factory with more than 20 patents, which are sold directly by the factory.

Installation site of waste steel crushing production line

The whole waste steel crushing production line is composed of feed conveyor, crusher host, discharge conveyor, magnetic separation conveyor, material distribution conveyor, dust removal and operation cabinet. The broken objects from the metal crusher are separated from ferrous metal objects, non-ferrous metal objects and non-metallic objects through belt conveyor and magnetic separation system, and sent out by their respective conveyors for stacking. The non-ferrous metal will be picked out by the magnetic conveyor and the recovery rate of non-ferrous metal will be improved at the same time.

Installation site of waste steel crushing production lineInstallation site of waste steel crushing production line
Our company will participate in the 14th Indonesian Exhibition in 2024