< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1169854197701293&ev=PageView&noscript=1" />

Domestic waste to fuel (RDF/SRF): post-processing stage

April 18 2025

The formed fuel (RDF/SRF) products enter the post-processing stage. The main tasks of this stage are quality improvement and packaging and storage. First, the fuel products are cooled by the cooling system, and then enter the screening equipment to separate qualified products from unqualified products. Unqualified products will be returned to the previous process for reprocessing.

The key to the post-processing stage is quality inspection and packaging. Qualified products undergo strict quality inspections, including calorific value determination, moisture content detection and combustion performance testing. Products that pass the inspection are packaged by the automatic packaging system and moisture-proof packaging materials are used to ensure stable quality during storage and transportation.

Storage management is an important part of the post-processing stage. The packaged fuel products are classified and stored in a special warehouse, which is equipped with a temperature and humidity control system to prevent the products from getting damp and deteriorating. The intelligent warehouse management system realizes the precise positioning and efficient allocation of products, and improves logistics efficiency.

Environmental protection measures in the post-processing stage cannot be ignored. The dust and exhaust gas generated during the production process are purified and meet the emission standards. The wastewater is recycled after treatment, realizing clean production. The refined management at this stage ensures the environmental compliance of the entire production process.

We are a professional Biomass/RDF/SRF/TDF Briquette System machine manufacturer, We provide turnkey and custom solution services.